Specset
← All updates

submittals

6 updates tagged “submittals

Review comments drawn on the page

Until now, review findings traveled as hoverable popups on each mark. That works in a viewer, but a flattened or printed package loses the hover, and the recipient sees marks with no visible comment. Turn on Show comments on the page and every issue also gets a red-pen style callout written on the sheet, with a leader arrow pointing at its mark.

Callouts are built to stay readable on real drawings:

  • One note per issue per page. An issue with several highlights gets a single condensed callout, not a duplicate per mark.
  • Whitespace-aware placement. Each callout is placed in nearby clear space, sized to the sheet. On dense pages the review skips a callout rather than stamp text over content, and busy pages are capped at a few callouts so the sheet never turns into red-text soup.
  • Fully editable. Callouts are regular annotations in the Annotate & Download surface. Drag one to a better spot or delete it before the package goes out, and the change sticks.
  • Popups stay. The callout carries the short correction; the complete finding remains in the annotation popup and the review record.

Enable it per project under Project Settings, Submittals, or flip the switch for a single review in the Annotate & Download sidebar, right next to the table of contents toggle. It works on existing reviews without re-reviewing; newly reviewed submittals get sharper, shorter callout text written for the sheet.

Read more in Submittal review.

AI-verified submittal review issues

Submittal reviews check a package against hundreds of spec requirements, and a review that casts a net that wide will inevitably flag some things that turn out to be fine. Until now, sorting those out was your job. Every issue a review files is now re-checked by a second, independent AI before it enters your issue list.

The verifier goes back to the package and actively tries to disprove the finding. It searches the attachments for content the review called missing, checks the submittal register for a separate package that covers the deliverable, looks for an RFI or addendum that supersedes the requirement, and reads the governing spec section for or-equal language that already permits the submitted product.

Findings that do not survive are dismissed automatically with the reason recorded, so they never cost you a click. Open a dismissed issue and hover its AI rejected badge to read exactly what disproved the finding, with citations that jump straight to the submittal page or drawing schedule the verifier used. Nothing is hidden: rejected issues stay in the Dismissed list, and one click re-opens any of them if you disagree. Issues that survive carry an AI confirmed verdict on the issue itself, with the verification evidence a hover away.

Read more in Submittal review.

Spec coverage checks for submitted products

Submittal reviews now cross-check every submitted product against your conformed specifications. When a product shows up in the submittal but not in the spec, the review flags it.

That catches the cases that are easiest to miss under deadline pressure: unapproved substitutions, items from a different spec section, and products that were value-engineered out but never left the submittal package. Each flag cites the spec sections that were checked, so verifying it takes one click.

Read more in Submittal review.

Annotate and download submittal reviews

Submittal reviews now produce a package you can send back as-is. The new Annotate & Download action stamps every review finding onto the submittal pages and exports the annotated PDF in one step.

Reviewers stay in control of what ships:

  • Editable issue marks. Move, reword, or remove any annotation before export. Edits sync back into the compiled review, so the record and the package always match.
  • Review-scoped marks. Marks belong to the review that created them, so re-reviews start clean instead of inheriting stale annotations.

Read more in Submittal review.

Review stamps

Reviewers can now finish a review the way they always have: with the firm's own stamp on the page.

  • Bring your existing stamps. Upload the same dynamic stamp PDFs you use in Bluebeam under Org Settings. Specset reads the stamp's form fields and figures out which is the date, the reviewer, the project, and which need manual input.
  • One-click placement. In the document viewer, choose Apply stamp, pick a stamp, and the date and reviewer fill in automatically. Anything left gets a quick prompt.
  • Stays with the document. Placed stamps persist with the document's annotations and come along in downloads.

Read more in Submittal review.

Submittal Review V2

Submittal review has been rebuilt from the ground up. Instead of walking a generic checklist, the review now starts from the submittal itself: it reads what was actually submitted and generates review checks from that content, then verifies each one against your specifications, drawings, and RFIs.

  • Submittal-first checks. Because checks come from the submittal's own pages, the review covers everything that was actually submitted, not just what a spec-driven checklist expects to find.
  • A citation behind every verdict. A finding is only allowed to stand if it cites the governing requirement, whether that's a spec paragraph, a schedule value on a drawing, or an RFI response. Click any finding to see exactly what it was checked against.
  • One review workflow. Findings consolidate into issues on a single Overview page. Step through them in the review flyout, dismiss what doesn't apply, and reopen anything later.
  • Ready-to-send exports. Download the review as a marked-up PDF package with a clickable issue table of contents, or as a spreadsheet.

Read more in Submittal review.